Ira Rampil's Build Log

N224XS

Last Update 11/3/2003

PreBuild Days
  1. Europa at Sun and Fun 2001

Phase One (Control Surfaces Kit)

  1. Inventory the Kit
  2. Close Out Flaps
  3. Flap Hinges
  4. Ailerons Closeouts & Hinges
  5. Stabilator & Trim Tabs CloseOuts
  6. Rudder Closeouts & Hinges

Phase Two (Wings)

  1. Metal painting &Reinforcing tape
  2. Aileron Bellcrank and Rods
  3. Pitot Static
  4. Fitting Control Surface
  5. Electrical Accessories in the Wing
  6. Closing Up

-> Special - Oshkosh 2001

Phase Three (Cockpit Module)

  1. Control Links
  2. Fuel System
  3. Pitch System
  4. Fuselage
  5. Cockpit Module
  6. Cockpit Module Bonding

Phase Four (Landing Gear)

Phase Five (Rudder Pedals and Cross Bar)

Coming Soon Phase Six (The Top Bonds On!)

Session 15 Implanting Instrument Panel

  1. Panel
  2. Airmaster
  3. Paint Job

Mods, Techniques and Current Panel Plans!